#Checklist List for Isometrics

 #Checklist List for Isometrics


  •  Company Standard Title Block, Job Number, Drawing Files, numbers, and revisions
  • Isometric North indicated
  • All the symbols are used as per Legend
  • Line Details (No. Spec. services, flow direction and Spec Break) as per P&ID
  • Design Pressure, Design Temp, Test Pressure, Insulation Class, Insulation thickness and   Radiography is indicated as per line schedule
  • Equipment number, nozzle no., nozzle orientation and elevation are as per piping layout
  • BOM (piping and supports) checked with respect to piping, material specification
  • If line is stress critical, stress analysis result is incorporated. Check in case of hot/cold line/stress critical large bore line
  • End to end dimensions & end connection of in-line instruments, ESD valves, Strainers any special items & control valves are verified
  • Extra-long bolts are considered for installation of Relief valve, Spectacle blinds, Wafer type valves, restriction orifice etc.
  • High Point Vent and Low Point Drain
  • Valves handles Orientation, ESD valve & control valve actuator orientation is shown on drg.
  • Pipe Support welded attachments are shown
  • Weld Points, Field welds and notes about dimensional verification at site are incorporated
  • Client and IDC comment incorporated
  • Open Vent/drain to safe location
  • Upstream/downstream straight run of pipe and orientation of orifice tap for meter runs.
  • Sloping lines, no pocket insured., slope line as per P&ID
  • Flow pattern of 3-way controls or multi-port valves
  • Line located from grid if not connected to equipment
  • Indicate output symbol and elevation where pipe passes through wall
  • Indicate Continuation on next isometric, logical split such that it is not at branch point/flange weld point or in pipe run
  •  Branch connection and correctness of branch fittings
  • Check for minimum spool based on pipe size
  •  Eccentric reducer flat side and offset shown.
  • Tie in point no if any 
  • Proper Notes & Holds & Revision clouds if any manually
  • Update isometric index before release indicating correct rev/hold